- Product name : EC-A-1000
- Capacity : 30-40A
- Allowable voltage: 90V ~ 264V ; 50/60HZ
- Absorption Distance: Unlimited
- Main function: Prevents electric shock by shielding, absorbing and reducing leakage current
ECSPD
This product was developed to eliminate electric disasters caused by the aging of existing electric facilities, the expansion of use of electric equipment, the increase in electric shocks in streetlights, and the increased surge damage.
Frequency compensation according to frequency modulation prevents electric shock accidents and shields external surges by shielding and reducing leakage current without external interference.
Development background
Increased electric shock and lightning damage
It was developed to reduce electrical disasters that can occur in various general electrical and industrial electrical environments.
ECSPD principle
ECSPD compensates the frequency by using “waveform (voltage, current) abnormality detection and frequency compensation control device” that utilizes a wavelength band based on the equipotential phenomenon between each phase (single-phase, 3-phase) to change the frequency to a constant amplitude without external interference. It is a principle that the electric power line is arranged electronically so that there is no potential difference, that is, “zero potential” so that no leakage current flows. This is a principle that helps prevent electric shock accidents by shielding, absorbing, and reducing leakage current.
By compensating the frequency with “Detected abnormal condition (voltage, current) and frequency compensation control device”, it is possible to prevent electric shock accident by shielding, absorbing and reducing leakage current without external interference.
Product composition
ECSPD Product composition
Basic specifications and customize of ECSPD technology
Range of voltage/Current | Customizing |
Voltage : AC110V / AC220V / AC380V / other voltage / DC voltage | Various sizes are available depending on the structure of the surrounding environment |
Current : applicable to the required level depending on the customized structure |
Ground Terminal | Function |
L / N | (+) / (-) |
FG (E3) | Leakage current shielding, reduction |
EPG (Load case) | Lighting surge shielding |
Ground Terminal | Function |
L / N | (+) / (-) |
FG (E3) | Leakage current shielding, reduction |
EPG (Load case) | Lighting surge shielding |
Model Name | AC ECSPD |
Model No. | • EC-A-1000 |
Rated current | • 30A (AC 30A or less) |
• 100A (AC 100A or less) | |
Voltage | • Allowable voltage : 90V ~ 264V. |
Frequency | • Does not matter whether 50HZ or 60HZ ( 110V / 220V compatible) |
Range | • Installation distance: Within about 10 ~ 50cm from the distribution panel. |
• Within about 10 ~50cm from the terminal power supply. | |
• ECSPD is directly attached to and installed at the end load (motor, device). (The closer the distance, the better.) | |
Main Function | • Electromagnetic wave-noise shielding, absorption and reduction |
• Prevention of electric shock by shielding, absorbing and reducing leakage current | |
Additional function | • Lighting surge shielding (40KA-8/20µs) |
Precautions | • Polarity must be correct before installation (refer to the installation manual). |
• It is necessary to select and install a suitable product according to the installation purpose (electromagnetic wave-noise shielding, leakage current shielding) and installation location. |
Grounding leakage current shielding device
Maintain the plate state normally before electricity is supplied and interlock with ECSPD, ENSPD Multi-functional terminal block that transforms signals into voltage and frequency in the form of constant voltage and sinusoidal waves to capture leakage current and shield ground fault current
How to connect GD-2000 (sub ground and ECSPD)
GD | Sub ground wire | GD | ECSPD |
E2 | Output connection | EPG | EPG connection |
FG | FG connection | ||
E1 | Input connection | N | N connection |
L | L connection |
How to connect GD-2000 (sub ground and ECSPD)
GD | Sub ground wire | GD | ECSPD |
E2 | Output connection | EPG | EPG connection |
FG | FG connection | ||
E1 | Input connection | N | N connection |
L | L connection |
Name | Multifunction grounding leakage current shielding device |
Model name | • GD-2000 |
Role / Reason | • Ground fault current shielding. |
• Acts as a ground distributor. | |
• Designed to connect FG-E1 and EPG-E2 to utilize 100% of ECSPD functions. | |
Precaution | • E1: Connect E1 to the load ground. |
• E2: Connect E2 to the load. | |
-> If there are many sub-ground wires, a sub-ground wire can be connected by additionally installing a ground divider. | |
※ E1, E2 can be connected according to the capacity of the ground wire. | |
Thickness of ground wire | • Ground wire thickness = circuit breaker (rated current) capacity × 0.0496 |
Ex) 50A of breaker capacity is 50 × 0.0496 = 2.48 (ie 4SQ), | |
Breaker capacity 100A is 100 × 0.0496 = 4.96 (ie 6SQ), | |
The breaker capacity 250A is 250 × 0.0496 = 12.4 (ie 16SQ). | |
• Use a grounding wire with a size one step larger than that calculated for safety reasons. | |
• The ground wire of appropriate thickness should be selected in consideration of the protection level and function of the installation site. | |
• Comply with electrical equipment technical standards or extension regulations. |
Characteristic
ECSPD product and technology features and electroless test
Waveform improvement by frequency modulation compensation device
- Safety standards for electrical products (K 60990 [IEC 99-08]) When electric devices such as power line electrical equipment boxes are submerged in water, only micro-currents that the human body cannot feel (equipment box 5mA) are generated.
- Electrical Appliance Safety Certification (KC Certification) Exception Products (Related Evidence: Electrical Appliance Safety Management Act Enforcement Rule Article 3)
- By applying the wavelength principle to the zero potential as “frequency modulation compensation control system”, shielding and reducing leakage current can prevent electric shock, shielding lightning surge
Waveform improvement by frequency modulation compensation device
- According to the Electrical Appliances and Consumer Products Safety Control Act(K 60990 [IEC 99-08]), when the AC 220V terminal is submerged in the water tank, the amount of current leaking into the water as shown in [Figure 1]is connected in parallel with the type 3 grounding to make sure it is less than 5mA.
- Check leakage current with 220V + ground wire
- Check the amount of leakage in accordance with Electrical Appliances and Consumer Products Safety Control Act(K 60990 [IEC 99-08])
Field of application
Certification Status
Status of related technology certification
Certification
Reviews
There are no reviews yet.